on ‎2018 Mar 21 8:30 AM
Please confirm if my understanding is correct.
We currently have EA-PS 600 in our system and we are planning to upgrade it to EA-PS 605. As studied, our current release version of 600 will not address our requirements below. Kindly help let me know if I am mistaken with the below assumptions.
MB21 reservation > Goods Issue
AS IS process: FM budget check (and consumption) ONLY triggers during GI (as actuals)
TO BE process: FM budget check (and consumption) should now trigger starting FROM MB21 creation
Assumptions upon implementation:
Request clarification before answering.
Hi,
This is perfectly correct. With small exception: not all material reservations create FM commitment on-line. Some of them, e.g. those generated from MRP, still require execution of a transfer program (RFFMRP_MAT_RESERVATION).
Also, make sure that you have recent package from 6.05, because there were some serious problems with MM reservation integration. Check for example if the following notes are included in your upgrade:
1521088 - MB21 create with reference uses same earmarked fund
2401501 - Error when posting a goods issue (MIGO) with reference to a funds reservation (BF PSM_FM_CI_3)
2106054 - MIGO : Cannot enter Funds Management Account Assignment when PSM_FM_CI_3 is activated
For general understanding of MM reservation integration with FM, you can consult note:
1321375 - Materials Reservation MM and Funds Management
Regards,
Eli
P.S. One more remark: even if you don't have budget structure, you still have to introduce FM elements in your MB21 or derive them through FMDERIVE logic.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 40 | |
| 9 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.