Hi All,
I have one standard package, /CPMB/LOAD_INFOPROV_UI. I used for load data from SAP BW. Then, I created one package link and assign this package two times. Because I need to load data using 2 transformation file and different info cubes. While I tested to run this package link, system shows me that Package link is now running. But, the package status did not show this process.
Please any suggest? Thanks
This message from system

Request clarification before answering.
You need to take a step by step screen shot of the package link and packages that are included, and then of the package link run. Currently your package link log does not even show the package link has been run which is not possible unless the screen shots are of either different model or a different environment all together.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Screenshot of View Package Link Status, please!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Addtional Info:
The package link have 2 tasks, and set prompt=Y.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 8 | |
| 6 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.