on 2016 Mar 10 10:11 PM
Hi,
We are going to perform SAP NW BPC upgrade from BPC 10.0 SP9 to BPC 10.1 SP8. Please share the upgrade check list which can use as part of pre/post Upgrade activities.
Reporting tool: EPM
Database: Oracle 11.2.0.4
Note: Our BW version (where BPC resides) will also be upgraded from NW7.31 SP6 to NW7.4 SP13
Thanks,
Robert.
Request clarification before answering.
Hi Robert,
It is a relatives low risk upgrade,
patch BW, then BPC, run migration program UJT_MIGRATE_10_TO_101
then you are done!
remember to backup your environment before upgrade.
Andy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 7 | |
| 7 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.