on 2019 Sep 18 8:22 PM
We are running BPC 7.5 on NetWeaver. In the controlling application, BPC 7.5 locks the category based on three dimensions: Category, Entity & Time. Is it possible to lock down on the profit center dimension too?
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Sorry, but this is not a work status setup! Do you understand how work status is administrated?
https://help.sap.com/doc/saphelp_bpc75_nw/7.5/en-US/a1/532226947c49a5b2e2bd32450cb2d1/frameset.htm
https://help.sap.com/doc/saphelp_bpc75_nw/7.5/en-US/ec/77b9eed94f4567968d414540d9c4e2/frameset.htm
| User | Count |
|---|---|
| 7 | |
| 7 | |
| 7 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.