on 2016 Mar 29 2:11 PM
Hello everybody,
I want to load the master data Profit Center into BPC dimension (BPC 10).
This master data has some attributes which are time-dependent.
For some needs, i want to have this attributes for all periods in BPC dimension.
How can i manage this?
Kindly let me know steps ,scenario and documents related this.
Regards
Oussama
Request clarification before answering.
Hi Vadim,
Thank you for your reply.
My need is to create interfaces of restatements for accounting entries for previous years. Ex: neutralization of an accounting entry, account classification, ...).
For example, to make a restatement of a profit center CP1 between 01.2015 and 12.2015, the user needs to know values of certain time-dependent attributes for this time period. These values are not necessarily equal to that of today.
I want this data like in BW:
Profit center Month/Year Attribut1 (TD) Attribut2 (TD)
CP1 01.2015 A1 B1
CP1 02.2015 A2 B2
*TD: Time_dependent.
Many thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
"For some needs, i want to have this attributes for all periods in BPC dimension." - For what needs? How do you want to have it?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Oussama,
As far as I know, you can not have time dependent attribute in BPC. BPC supports time dependent hierarchy.
Shri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 15 | |
| 11 | |
| 11 | |
| 4 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.