on 2023 Oct 12 9:29 AM
Does anyone advise more on JVA drilling overhead calculation(JV overhead type 4; CFR drilling U.S.)?
0. Drilling stat. ration is inputted with rate 80,000 under GJAA(JOA).
1. A WBS element is assigned with JV overhead type 4.
2. SKF "DWR01" is created and inputted in GJ77(JV stat. ratio).
3. 15 (total values) in DWR01 was inputted in Oct..
4. GJ95(overhead calculation) does not calculate any amount.
Is there any missing point?
Request clarification before answering.