on 2023 Oct 16 5:44 PM
I have a product type 550 with variable interests. When I try to post variable interests I have to fix this interests first through TJ05. The problem is that if during a period in which there are variable interests not fixed there is another flow such as a repayment, I cant post them and they appear as "Previous flow does not permit posting"
Is there anyway to fix this so I can post other flows while interests arent fixed?
I attach an example where there are no interests until 01.02.2022
Request clarification before answering.
User | Count |
---|---|
11 | |
9 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.