on 2017 Nov 21 6:24 AM
Hi All
We transfer a materiel Multilevel BOM from ECC to GTS system.
I can only see one level BOM,
Request clarification before answering.
Hi, try to change the type of explosion from top-down to bottom-up.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Mouaz BEN REDJEB Thank you for the reply ,
In the setting specified , we have 2 entries : BOM Catagory Static and configurable-> type of explosion is top-down(multi step) ,plant based preference determination, assemby and production are checked.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Farooq,
Are these recursive BOMs ?
What are the settings you have maintained in ECC in:
Sales and Distribution > Foreign Trade/Customs > SAP Global Trade Services - Plug-In > Control Data for Transfer to SAP Global Trade Services > Control Transfer of Bills of Product for Preference and Re-Export
Regards.
Mouaz BEN REDJEB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 8 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.