on ‎2022 Apr 20 8:32 AM
Hi everybody,
we have on ERP side one development system, two quality systems and one productive system. Now we wonder how to best connect the two quality systems to GTS. Should we set up two separate GTQ systems or connect the two ERP systems to the same GTQ?
What consequences would we have to expect after e.g. a system copy?
Has anybody already dealt with this situation?
Thanks,
Carsten
Request clarification before answering.
By using the concept of shared directory in SAP -
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.