cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

How to Create an entry in the feeder system worklist for configurable materials?

0 Kudos
630

Dear Experts!

I want to transfer the configurable BOM to GTS by following the steps linked below. I have created a sales order with configurable materials, but have not found a new entry in this place: in the feeder system, choose on the tab page Documents SAP Risk Management Preference: Display Worklist of Configurable Materials.

Preference Determination for Configurable Bills of Material | SAP Help Portal

How can I deal with this issue?

Thanks!

View Entire Topic
BenjaminB
Active Participant
0 Kudos

This could have various reasons.

Did you check the worklist in SAP ERP with transaction: /SAPSLL/KMATWLR3_03 ?
Did you transfer the materials in SAP ERP via /SAPSLL/KMATBOM_DIR3 ?

0 Kudos

Hi Benjamin,

I have transferred the materials in SAP ERP via /SAPSLL/KMATBOM_DIR3.

But with this transaction:/SAPSLL/KMATWLR3_03, entering the sales order number still shows that no data was found.

Am I making a mistake in creating a configurable material? But I have set the Configurable flag in the Basic Data area of the material master record. Or do I need to make other Settings when creating configurable materials?

Looking forward to your help!