cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

GTS Go live - From existing common GTS box to individual GTS Box

0 Likes
278

Hi All,

As on today , we have one GTS common system connected to multiple ECC system ( xx1 (GTS)) to xp1,xp2,xp3 (ECC Systems). As one of the division going out from existing set up, we are separating GTS system of division and moving into new GTS box. That means , in place of xx1, we are setting xx2 ( GTS) system and it will be conncted to only one ecc system (xP1). Hence as part of cutover activity , we need to connect existing ECC system (xp1) to new GTS system (xx2). To process orders which are being created in ECC during GTS system downtime (during disconnect xx1 and connect of xx2), we are planning to reprocess orders stored in /SAPSLLOBJIDX table. But when we try to mimic the scenario in Quality, though orders being stored in /SAPSLLOBJIDX table, no compliace checks are happening due non avilability of GTS system and allowing us to subsequent documents. hence we are not able to down the GTS system for our testing purpose. Clarification needed on below queries.

1. When existing RFC disconnected from ECC, all documents created in ECC will be stored in /SAPSLL/OBJIDX table ?

2. And when we blocked the RFC from GTS side ( to make the GTS system down) and tried the test scenario by pushing orders from ECC, we were able to create Delivery from order though subsequent process not allowed as per config. And system not checking for GTS compliance checks when we block the RFC from GTS side to make the GTS sys down.

3. Is there a way to make the GTS system down to test scenarios from ECC side.

Thanks in Advance ,Your input is much appreciated!

Accepted Solutions (0)

Answers (0)