on ‎2019 May 13 9:20 AM
Hi there,
we are currently performing a "real" migration from GRC10.1 to GRC12. Due to technical dependencies (certain addons/components) it is not possible to upgrade the existing GRC10.1 box to GRC12; so the only way is to create a fresh GRC12 box and migrate the data from the legacy system GRC10.1
Most of the Application/Master data can be migrated manually as there are several options for up/download available, Also the customzing can be collected with merging the imported transports, but so far I don't know how to handle pending workflows (FF log review, open access requests, etc) in such a case.
(I know there were options offered by SAP during GRC5.X to GRC10.x migrations) but for a GRC10.1 system I didn't find anything simlar.
Does anyone know a way to handle that kind of data.
thank you
Johannes
Request clarification before answering.
Hi maquet.jt,
Did you get a solution to this issue? Can you please share your exprience?
Thanks,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello, have you found an answer to this?
I'm interested to understand the solution since we are using the same approach.
Thank you
SC
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 11 | |
| 6 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.