on 2023 Aug 14 8:47 AM
Hi Guru,
I need calculation condition with grading, but on the other hand, I have other condition that will use formula E1 to calculate percentage from the result of grading calculation. How I solve this requirement?
In one side, differing measurement can not handle grading calculation, I must use sales-based rent condition, but the problem is I can not use formula E1 % in other condition to calculate % of the grading result from SBR condition.
Appreciate your advice.
Thank you,
Budi
Request clarification before answering.
User | Count |
---|---|
6 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.