on ‎2021 May 11 6:56 PM
Hi experts,
I've read the SAP note 1321375 and I realized it's not possible create automatically an earmarked fund to reservation generated from MRP and PM.
I'd like to know how the system deal with reservations created from PS (Project System) module that use network. Is it possible set up this automatic process in a standard way or we need manually call the program RFFMRP_MAT_RESERVATION as is advised for reservations gerenated from MRP and PM modules?
Thanks a lot.
Kind Regards,
Rodrigo Amorim
Request clarification before answering.
Hello experts!
I've opened an incident at SAP regarding note 1321375. It has been updated and now its content says it is not possible to integrate PS reservations with earmarked funds automatically.
It's necessary to call the program RFFMRP_MAT_RESERVATION manually to generate the commitment.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 8 | |
| 7 | |
| 6 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.