on ‎2018 May 25 9:25 PM
Hi Friends
When I use transation FMZ6 to reverse fund commitment, I put original document (made in FMZ1) and date, this proccess is ok, but when I check FMRP_RFFMEP1AX report, its show the same date and period of original document (FMZ1) for reversed line ( reduction line 0500), my question is: Is there any configuration or note to indicate that reversed line has differente date? I put diferente dates in fmz1 y fmz6 and I my costumer have Hana DB, I test and another costumer without Hana DB everything is ok.
Kindly provide some insights, It will also be great if a SAP help link on the same is shared.
Regards,
Ronald
Request clarification before answering.
If you have 0109 profile, it's normal behaviour. Only if you have a profile with period-based encumbrance, you would have the postings registered on the basis, you want them to.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
What FM update profile do you use?
Regards,
Eli
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 34 | |
| 6 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.