cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

DataSlice/Workstatus Concept in BPC 10.1

0 Likes
494

Hello,

We are investigating BPC 10.1 embedded version on our BW (on Hana) system (7.40).

I searched a lot but i couldn't find a proper document or how-to  blog about using data slices in BPC 10.1 embedded version.

I tried to create work status and changed the status of activities but i am not sure how this will affect my data-slices on the data-entry cube.

Can somebody tell me how the logic should look like, so that my data-slices will reflect to my actions in Work statuses.

Thank you

Ozan

Accepted Solutions (0)

Answers (1)

Answers (1)

gregor_dieckmann
Product and Topic Expert
Product and Topic Expert
0 Likes

Hi Ozan,

in BPC Embedded the effect of work status settings in input-ready queries or planning functions is implemented by run-time data slices. This works out of the box, besides work status you don't have to configure anything else.

Blog about BPC Embedded concepts: use your favorite search engine e.g. with the string 'concepts compared BPC embedded'.

Regards,

Gregor

0 Likes

Hi Gregor,

Thank you for your input. Does it mean we don't need to create any data-slices on top of infocube?

(my first understanding was, 'work statuses' will affect the data-slices which exist on infocube..)

And does any database table keeps the information about those 'run-time dataslices', when they are active (meaning work status is set to 'in process' maybe)?

Thank you in advanced

Ozan