Cost calculation

0 Kudos
129

I have two questions regarding cost calculation:

1. There is 1 finished product for which the bill of materials has not yet been created. Is it possible to enter the standard cost manually without going through the cost calculation? Do I have to use MR41? If yes, how can I extract a Material - Standard Cost report that also takes these manual entries into account?

2. I would like to update the standard costs of raw materials with the weighted average cost calculated to date. Is there an extraction that calculates the weighted average cost for me or do I have to use the tax variant of the cost calculation? And once calculated, do I always have to enter them with MR41?

thank you