cancel
Showing results for 
Search instead for 
Did you mean: 

CK40N for different production version

0 Kudos
425

we add a production version,so a material number have two production version,

when run cost valuation,we can assign group number In the quantitative structure interface in CK11N to issue standard cost.

But we cannot use "group number" by dynamic selection in first step "select"when using CK40N to handle multiple materials,for there is not complete data in the table of MACKW

May I kown the reason and how to solve this problem?

Accepted Solutions (0)

Answers (0)