on 2023 Sep 05 12:48 PM
we add a production version,so a material number have two production version,
when run cost valuation,we can assign group number In the quantitative structure interface in CK11N to issue standard cost.
But we cannot use "group number" by dynamic selection in first step "select"when using CK40N to handle multiple materials,for there is not complete data in the table of MACKW
May I kown the reason and how to solve this problem?
Request clarification before answering.