on 2019 Sep 21 9:06 AM
Hi, good day.
We are having trouble with a series of errors that we do not know why occur systematically in all closures at the end of each month and that cause inconvenience when it comes to calculating the cost for each one of the products of the company. We would need you to give us a guide on how to solve
these errors, that is, what they mean, where the problem, why they occur and how it is corrected.
The main errors that we are having are the following (I´m gonna paste Number and message that the system tells me):
- 023: for this activity class ... there is no version, activity planning or quantities. - 168: Cost calculation for material / plant ..... incorrect. - 060: The valuation of the cost calculation object has not been performed. - 229: For material ... route map could not be determined. - 240: cost stratification calculated with value 0. - 256: No cost field has been defined for fixed costs (This is important, cause more than half of the incidents are from this) - 424: Material ... Center ... Doesn´t have materials list. - 465: For material / lot ..... Center .... No pricing could be determined.
<br>
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 8 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.