on ‎2019 Aug 19 10:29 AM
Hi ,
I have a requirement to run a consolidation in BPC 10.1 embedded for several (plan) periods. I know that I can run it period by period through the consolidation monitor, but as we are looking at 36 months this seems a bit inconvenient.
I have found note 2638112 (https://launchpad.support.sap.com/#/notes/2638112) wich states that this is currently not possible in BPC.
But my question is, is there a way using FOX code, ABAP or similar to make it possible? Has anyone done this before, I can't imagine that this is such a unique requirement.
Thanks,
Arnold
Request clarification before answering.
| User | Count |
|---|---|
| 41 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.