cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

availability of the consolidation for embedded BPC

Former Member
0 Likes
180

As we know SAP BPC for S/4 HANA will use the embedded BPC to do the planning now,Anybody know the availability time frame for consolidation with embedded BPC?

Thanks.

View Entire Topic
Former Member
0 Likes

That day is now: