on ‎2020 Feb 10 6:53 AM
Hello,
While Activating the contract I am getting the error "Activation is not possible due to warnings (Posting Term)".
I have multiple BP's are assigned to a contract. Ex. "A" has contract start date as 02.10.2019 and "B" has contract start date as 15.10.2019 and the total rent for the month is 2000 and to be calculated as for "A" 1500 and "B" 500.
I have maintained multiple posting terms accordingly.



I have attached screenshots.
Regards,
Rama
Request clarification before answering.
Hi, normally you can't have 2 of the same BP's that are valid at the same time. This depends however on the cardinality of the BP.
Apart from that if you want the same condition type to be charged to 2 or more different BP's you should use the condition split functionality in the posting term setup.
See screen shot attached. That way you assign only one condition type and the split will be made in the cash flow simulation.


Regards, Andre
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 11 | |
| 6 | |
| 4 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.