on 2023 Aug 25 1:46 PM
Hi All,
We are trying to implement a POC for SAP BIS ( Business Integrity Screening ) in our sandbox system and are facing challenge while executing mass detection of detection strategy for Vendor Without Bank Details( Detection Method: FRA_IA_PUR_V_MD_WO_B).We have been facing the same error for other detection strategies as well.
Error: 0 detection objects selected for processing.
Detection Strategy: Z_TEST_BIS_2 detection-strategy-1.png detection-strategy-2.png
Detection Method: FRA_IA_PUR_V_MD_WO_B detection-method.png
Detection Object: FRA_VEND
Component Details: -
SAPFRA 14S 0000 - ASSURANCE and COMPLIANCE
UIACS 14S 0000 - Ui for ASSURANCE and COMPLIANCE
Database: HANA DB
System architecture: -
Back end deployment: Parallel Deployment in SAP HANA
Front end deployment: Single System Deployment with Embedded Front-End Server
Could you please in identifying on what might be causing this issue and how can we resolve this issue?
Request clarification before answering.
User | Count |
---|---|
6 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.