cancel
Showing results for 
Search instead for 
Did you mean: 

Underdelivery not allowed for final confirmation

suresh_bachan
Active Participant
0 Kudos
1,001

Dear all,
Operation confirmation is generating un error:
- Underdelivery not allowed for final confirmation (check entry)
- Message N° RU036

overdelivery/ underdelivery tolerances are maintained in OPK4 as follows:

Underdelivery : X Error when quantity falls below underdelivery tolerance
Overdelivery: X Error when overdelivery tolerance is exceeded

Now the error appears in the following case:

Operation qty = 50

Yield = 45
Scrap = 5

Normally the sum of the yield and scrap quantity is 50 but couldn't confirm the operation, I have the error message RU036 (

Underdelivery not allowed for final confirmation (check entry))

Thanks in advance for your help

Accepted Solutions (0)

Answers (4)

Answers (4)

suresh_bachan
Active Participant
0 Kudos

Hello Rupesh, we are not using a single screen entry (CO11N) in which SAP not 692199 refers to. We have a customized tcode equivalent to CO19.

rupesh_brahmankar
Active Contributor
0 Kudos

Hello,

Please check in default confirmation type in the Customizing of the single entry screen Transaction OPK0 is set to Partial confirmation.

In CO11N use final confirmation

Operation qty = 50

Yield = 45
Scrap = 5

And check if you get same error message.

Or you can overwrite this message, please refer SAP note 692199 - Modification: Suppressing Information Message RU039

Best Regards,

R.Brahmankar

suresh_bachan
Active Participant
0 Kudos

Hello Caetano, thanks for your feedback.
Note 203107 explains only about PLANNED scraps during goods receipts, in my case I am facing this issue during actual scraps defined during confirmations.
As I have explained earlier, I cannot confirm 45 + 5 (scraps) with B40, even though I have 50 pcs total in my previous operation.
Best regards,

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

Please read carefully the following SAP note, as it talks about the scrap in the confirmation and it explains the standard logic behind this calculation:

203107 - Proposed quantity for planned scrap

Regards,
Caetano