on 2012 Jan 25 11:00 AM
I want to find the Table - field relationship to trace a Planned order from Purchase Requisition.
Once we convert planned order to purchase requisition, system deletes planned order in MD04.
Is it possible to find out which planned order had been used to create purchase requisiton.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raj,
Generally Peggeed requirement is nothing but it represents the Higer level material. For example if raw material purchase requisition for 100 nos, then it is a Pegged Requiremet of the Assembly or the FERT. Simple its a dependent requiremnt for FERT or SFG.
MD09 is used to find out the Pegged Requirement. If you give the Purchase Requisitiion of the Raw material, then system will tell you the pegged requirement i.e. the production order order to which the purchase requisition belongs to.
Pegged requirement may be a Sales Order,Reservation,Production Order,Project,Network,WBS etc.
Select one MRP element in MD04 screen and if you select pegged requirements system will show you these elements created for any higher level material or not.
Note :Once a GR is done to PO, there is no more pegging possible for the PO, as it is in Inventory. Pegging is possible as long as it is an open order (PO, PR etc.)
Apart from above case If you have other requirment you to devlope your own.
Regards,
Ram