2025 Sep 07 11:44 AM - edited 2025 Sep 07 11:45 AM
Hello QM Expert,
Time-based inspection points are scheduled to repeat every 1 hour. In operation 0010, three inspection characteristics (MIC1, MIC2, and MIC3) are assigned. During the initial in-process inspection, all three characteristics should be included in the inspection lot. However, for subsequent time-based inspections, only one characteristic (MIC3) should be repeated, while the others should not be required. (Restricted to a single inspection characteristic).
Current System Behavior
In the standard setup of time-based inspection points (configured in the routing header and operation), all three inspection characteristics are repeated at every time interval. We also tested the approach of splitting into two separate operations, but it does not fulfill the requirement as intended.
Business Need
The requirement is to achieve this functionality within a single operation, so that:
How can we achieve this in S/4HANA Public Cloud?
Request clarification before answering.
@device21 Check the Inspection Frequency field Haeufigkeit in the master data of MIC1, MIC2, and MIC3. Set MIC1/MIC2 to '0' and MIC3 to '1'. Test thoroughly
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 29 | |
| 14 | |
| 14 | |
| 6 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.