on 2022 Nov 29 12:59 AM
As a part of our S/4Hana 2021 Upgrade, we will upgrade the OS to SLES 15.
When we get to the Downtime Phase, we need to failover to the secondary node so that the primary node can be upgraded to SLES 15 in parallel with our downtime processing. The SLES High Availability is not available as mentioned above.
Does SUM handle the takeover to the secondary node? Do we run any kind of manual task at the OS that the Cluster would normally handle?