Hi all

Here is my scenario. I have two plants. One is the production plant and the other is my FG warehouse. My problem is that my subcon PO is generated in my production plant (so the requirements for the components can be included in MRP Run). Now the clients wants to receive the subcon PO straight to my FG plant. Is there any way to do that?

Please help

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Please go through these steps for subcontracting step by step method:

There are two types of subcontracting relevant for PP module:

1. Operation subcontracting

2. Assembly subcontracting.

Assembly subcontracting:

Total product can be given for subcontracting.

We have to give the raw materials to vendors and they would supply the assembly.

This can be done with special procurement type 30 with procurement type F.

In that case you need to create X (FG) and their child parts (A/B/C).

You need to do the following setting for the same-

1) FG material master Special Procurement type 30 in MRP-3.

2) During MRP run select indicator 3 for create purchase requisition.

3) Convert PR into PO and maintain item category L and explode the BOM

4) In Sub-Con Purchase order, System will collect automatically its child parts.

5) Transfer the material by Mvmt-type 541 referring the Purchase order to the Vendor. This will give a Mat Doc Number.

6) You can receive the complete FG thru simple MIGO process mentioning.

Operation subcontracting:

Within in-house production if some capacity bottleneck exists in any operations then you can assign this job to some vendors to carryout this job in his premises and supply us the semi-finished part. This can be done via control key example PP02 (external processing control key and activate the subcontracting Check box in routing).

Option1:

1) In Control key PP02 enable external processing and in the routing in the operation detail enable external processing under radio button sub contract.

2) In Order type dependent parameter T code OPL8 enable reservation / PR creation - 3 (immediate reservation / PR creation) during release / confirmation.

3) Create Info record T code ME2O only for vendor no material combination. (You are not going to issue material for the vendor through SAP) system will not allow through ME2O since it is operation subcontract.

4) Run MRP it will not create PR directly since the it is enable in OPL8 only after release.

5) Do the In-house operation then confirm the in -house operation in CO11n. Once the previous operation is confirmed PR is generated automatically.

6) Then Convert PR to P.O. In purchase order only operation description will appear. since no component is assigned. And the order type will be F.

7) Then make separate DC (Gate pass). Consult your MM guy for this.

:smiling_face_with_sunglasses: If any component is assigned to the operation. Do stock transfer to Vendor storage location till such time it comes to factory again.

9) While return from vendor do MIGO against the P.O and it will come settle in prod order.

10) Payment to the vendor is through service record entry concept. Consult MM gut for this.

Option 2:

1) You have to create separate material master for that operation. Treating that it will be a different material

2) Create Vendor master with Material and Vendor combination

3) Create BOM with header material and this material as item for the header.

4) Create Routing for the header material with only one operation with control key PP02.

5) Assign the item material to this operation.

6) Run MRP this will create PR automatically. Then convert PR to PO

7) Send material to the vendor through ME2O

:smiling_face_with_sunglasses: Do the GR MIGO the item will come have header material and it will automatically update in unrestricted stock.

9) Payment to the vendor will be with different not as service entry concept consult MM guy for this.

Hope it helps.

Regards,

Kaushik

Former Member
0 Kudos

Hi,

The required scenario is not very cleared, but still go through the following thread, it may be helpful to you.

Regards,

Hiren Ramani

Former Member
0 Kudos

Hi HirenR

Let me rephrase

Plant A - Production plant

Plant B - Warehouse

My subcon PO is created in Plant A but I want it to be received (movement 101) in Plant B. Is this possible?

Former Member
0 Kudos

Hello obie - one option here is to create a transfer order to move material from from A to B when you confirm the product. You can write a code to create a TO from A to B if whenever you have a order of this type.

Hope this pointer helps.

Pradeep.