Hi,

What is the significance of Strategy Group & how the system follow or search the path for Desired strategy ?

What is the name of MRP Table.

Thnx in advance

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

To make up a product we need some requirements in the form of demand.

This requirements are independent requirements and customer requirements

To create a demand Program the Demand Management uses PIRS and

Customer Requirements and we need to define a planning strategy

Planning strategy define the methods of production for planning and

manufacturing a product.Using these strategies we decide whether

production is triggered by sales orders or not ie MTS OR MTO

Requirements classes:

We need to define requirements class which contains control parameters

for planning and consuming the PIR and customer requirements.

This Requirements class is to be assigned to requirements type

By doing this we are indirectly assigning the control parameters to

strategy via Requirements type

This Requirements Type is to be assigned to strategy

Strategy should be assigned to strategy group

Strategy group is to be assigned to Material in Mrp 3 view or via MRP Group.

Preference will be given to strategy maintaine in MRP 3 View.

If no strategy is maintained here the system searches for the MRP Group

Regards,

nandha

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Pradeep,

The significance of strategy group is you can cumulate the related planning strategies in this upto 8 and maintain for one finished part. You cannot plan and passed requirements of a finished part without planning strategy and this will be technically controlled by MRP type in the planning run.

The first prefernce will be given to the plannign strategy maintained in the MRP3 view planning group...if this is not mantained then system checks the MRP group planning strategy.

If it is not maintained at both places the material will be planned from MRp type but the you will not get the requiements with proper requireement type.

The MRP related tables are:

MDKP Header Data for MRP Document

T460C Order/Purchase order types for planned order

RESB Reservation/dependent requirements

PLAF Planned order

T438M Control Parameter for MRP -Material Level-

PBIM Independent requirements for material

If helpful then rewards your points.

Regards

TAJUDDIN

HANABE
Newcomer
0 Kudos
Hello Tajuddin. I have some questions regarding MRP can i contact you?
Former Member
0 Kudos

hi pradeep,

Strategy

The planning strategy represents a planning procedure for planning a material.

It is defined by one of the following:

<b>a requirements type from demand management

a requirements type from sales order management

a combination of both that makes sense</b>

The strategies available for creating the master plan can be seen in step "Define strategy".

Strategy group

You use the strategy group to group together all the valid planning strategies. Thus, more than one planning strategy can be allowed for a material.

<b>MRP TABLES</b>

MDKP MRP Document Header Data

MDTB MRP Table Structure (no data)

PLSC Planning Scenario (Long-term Planning)

MDFD MRP Firming Dates

MDVM Planning File Entries

S094 LIS -- Stock/Requirements Analysis

THNAX