We would like to use strategy 81 (assemble to order with planned orders) and also take the lot sizes (max. lot size) into account.
Example: With a maximum lot size of 6 pieces, 2 planned orders should be created for a customer order of 8 pieces via assemble to order processing (planned orders). One for 6 pieces and one for 2 pieces.

We need it because we need the availability check for the components and also the capacity check. But we also need the system to consider the lot sizes from the material because of the restrictions on the production shopfloor.


Can the lot sizes from the material master be taken into account in assembly processing or not?

Thank you very much.

Accepted Solutions (0)

Answers (0)