cancel
Showing results for 
Search instead for 
Did you mean: 

SPRO - "Assign Secondary Screens" in Material Master

flvia_s
Participant
0 Kudos

Dear experts,

We have created a new subcreen under "Additional Data" in MM01.

We also reordered the "Additional Data" tabs via SPRO: Logistics - General / Material Master / Configuring Material Master / Assign Secondary Screens.


Everything is working fine, but the changes we applied under "Assing Secondary Screens" do not request a transport order. Do you know how to assign these changes to a customizing order, please?

I have checked already and after sending it to our Quality System, these specific changes are not there.

BR,
Alm

secondary-screens.png

flvia_s
Participant
0 Kudos

I will follow the instructions presented in SAP Note 2493598 - OMT3R: Transport option is grayed out.

Accepted Solutions (0)

Answers (1)

Answers (1)

ankurch
Active Contributor
0 Kudos

Hello Silva,

Can you check in your system in tcode "SCC4" changes has to be recorded through TR?

flvia_s
Participant
0 Kudos

Hi Ankur,
I don't have access to SCC4. But how could it help me? Is it possible to set up this kind of configuration there?
Note: only "Assign Secondary Screens" is not being saved. Everything else is.

BR,

Alm

ankurch
Active Contributor
0 Kudos

In SCC4 you will got to know that TR is required to capture any changes or not, now if it not captured in TR can you try to do the same change in QA as well; if it ask for TR then do not do it but if it doesn't then do it.

Thanks,

flvia_s
Participant

Thanks, Ankur.