Hi All
I have allowed shared safety stock for planning (e.g 30%).
When I am trying to run MRP (MD01n) to check it impact then I noticed it is working perfectly with static safety stock (MRP2) but when I tried same material with Range of coverage (dynamic safety stock) it is not working as expected.
System is always creating receipts elements to meet dynamic safety stock level (I mean it's not allowing to go below Min/target level)
Is this expected behavior with shared safety stock functionality?