on 2012 Dec 21 8:26 AM
Hi Gurus,
I have one issue
We have maintained batch management for material.
In material master we have maintained total self life as 20 months. We are entering production date at GR, but system calculating expiring date as 21 months by default.Its calculating one month extra as expiring date.
How can I solve this problem , system to calculate correct expiring date?
Plz help me
Thanks
Ramesh
Give details, tell the date you entered as production date and tell the expiration date, only then we can evaluate
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It is design that the shelf life date of an existing batch is not overwritten
Just imagine you buy a yogurt with vendors batch #2305 which has a expiration date of January 1st.
a week later you buy again yogurt which has the same vendor batch #2305. Just because you bought it a week later it does not mean that it is usable for one more week.
This is one of the main reasons why a material is managed in batches , same vendor batch goes to the same of your batches, different vendor batch goes to new batch in your system. SAme batch means same characteristic, same quality, usually no need to analyze it again.
User | Count |
---|---|
92 | |
8 | |
6 | |
5 | |
5 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.