Schedule Line for Make to Order Item.

Former Member
0 Kudos
1,627

Hello

In make to order scenario, there are 2 schedule lines for the MTO item in create mode of Order. 0 confirm quantity on the req

When I save the order, i can see only one schedule line with confirm quantity 0.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Make-to-order production is controlled by the requirements type. The requirements type is

determined on the basis of the MRP group and the strategy group in the material master record.

 Create material by specifying item category group as 0001 = Make u2013 to u2013 order (Normal item)

In MM01 Basic data tab, General item category field [0001] = Make u2013 to u2013 order, 0002 for configurable

material

Make u2013 to u2013 order checking group for availability check should be [02] = Individual requirements in Sales:

General/Plant tab.

 Go to VA01 and raise the sales order by specifying this material that we created in the previous step

Item category is TAK

Schedule line category = CP

Requirement type = KE [Sales order Header  Procurement  Requirement field]

KE = Individual customer order without consumption

(For standard items item category group = NORM)

System determines requirement type 041-order/delivery requirements. This requirement type points requirement

class where we can control whether the system has to carryout TOR, Availability check, and Product allocation

functions.

Hope this helps.

Regards,