The past QA seems that it's possible to use production order without PP master instead of CO production orders(KKF3) in SAP S/4 HANA cloud public edition (GROW).
CO Production Order Issue in S/4HANA Public Cloud - SAP Community
I checked scope item 3F0 as mentioned answer.
It seems there are reporting functions for event-based processing costs, work in progress, instructions, etc. but it does not include the registration of manufacturing instructions or the entry and exit of instructions.
I have checked other scope items and I have confirmed that it is possible to register, issue, and receive instructions for items without a PP master (BOM/operation procedure) in BJN scope item (production order type:YBW1). However, since this scenareo is merely a rework manufacturing instruction process, I think that cases where items without a PP master are manufactured are outside the standard.
Based on the above, there are any scope items that can increase production inventory without using the PP master?
And if so, what is the ID?
OR, is it OK to use for production without BOM or work procedures even if BJN is a scope item intended for rework?
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 27 | |
| 14 | |
| 13 | |
| 6 | |
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.