on 2019 Jan 20 6:24 AM
Recurring inspection
Requirement is - Quality team wants inspection lots to be created after the SLED date is reached.
Means first inspection date in the Batch hear master should be equal to SLED date.
After the first inspection they want to do the inspection in intervals.
Any solution for this ?
Request clarification before answering.
Can be Standard SAP Deadline Monitoring depending on your inspection interval values and SLED date values.
You might need to use some user exits at batch creation to set the inspection intervals and SLED dates to meet your requirements.
You may also need to use QEVA0003 Calculate “Next inspection date” met your next inspection date requirements.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you. User exits at batch creation did the job.
User | Count |
---|---|
19 | |
10 | |
8 | |
7 | |
7 | |
7 | |
6 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.