SAP QM IDOC- Transfer inspection lot

6,407

Dear Experts,

Requirement- Inspection Lot will be created in SAP ECC without inspection plan. This inspection lot information should be transferred to other NON SAP System. Non SAP system sends the UD. When SAP receives the Usage decision from Non SAP system Inspection lot should be closed. We have SAP PI/PO sytem.

Question : What is the best possible way to fulfill this process. RFC or Proxy or IDOC.

Is there any standard IDOC for transferring Inspection lot data (Material, quantity, Batch etcc.. NO charcteristics)

What is the message type and Segments.

Please suggest me best possible way to achieve this.

Thanks in Advance.

View Entire Topic
former_member42743
Active Contributor

You can turn off the check "insp. with charac." in the relevant inspection type settings. This allows the plan to be assigned as normal but does not create any inspection characteristic data for the inspection lot.

It only needs to have a UD made.

What kind of external system are you trying to hook up too? Must laboratory systems already have experience with integrating to SAP and can usually provide you with necessary info to do this.

Craig