on 2019 Aug 02 4:56 PM
Dear Experts,
Requirement- Inspection Lot will be created in SAP ECC without inspection plan. This inspection lot information should be transferred to other NON SAP System. Non SAP system sends the UD. When SAP receives the Usage decision from Non SAP system Inspection lot should be closed. We have SAP PI/PO sytem.
Question : What is the best possible way to fulfill this process. RFC or Proxy or IDOC.
Is there any standard IDOC for transferring Inspection lot data (Material, quantity, Batch etcc.. NO charcteristics)
What is the message type and Segments.
Please suggest me best possible way to achieve this.
Thanks in Advance.
Request clarification before answering.
Hi Sara,
Thank you for the reply. We can include a dummy charc, but i am unable to find a Standard IDOC which triggers after inspection lot creation and contains insp lot data.
?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
7 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.