I have a requirement to generate physical samples for each operation listed in the inspection plan. Each operation has a different MIC compared to the other operations.
Thank you
Request clarification before answering.
Greetings,
you need to use proper sampling procedure which supports partial samples. Partial samples are then assigned to inspection characteristics which are in turn assigned to operations.
Try following the links bellow:
Best regards, M.