Hi All
I've created a new Freely Defined Inspection Point in Public Cloud to be quantity based:
Number length 10 1 Quantity in UoM (No other field is populated except Field Combination (ZQ1) and Description.
I then went to Routing and add Operation with Work Center = QMLABS, Control Key QM01 and on Routing Header I added ZQ1 at Insp. Points.
On Operation Details, I selected Quantity, valuation and confirmation (production) for Insp.pointCompletion and No ref. Maintained
When I do a Check, I get error QP256.
In SAP Help, I get this:
For each respective step in the operations for the routing you define,
What the inspection interval should be between the inspection points (for instance, 10 minutes or 3 containers)
How the quantity should be entered with time-related intervals
Whether the last partial lot assignment, which is therefore relevant to goods receipt, takes place during results recording (optional)
I want to have an Inspection Point for every 10th Piece, but not sure where to put this.
I also don't know why I get the error.
Any help will be appreciated as there is not much available for Public Cloud.
Thanx
Request clarification before answering.
| User | Count |
|---|---|
| 23 | |
| 12 | |
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.