cancel
Showing results for 
Search instead for 
Did you mean: 

sap ePP/DS product planning table: resource view periodic: need to see the resource load in hours

ws
Participant
0 Kudos
203

Hi,

 

the resources in the resource view periodic in the PPT are showing only the resource load in %. 

what is it required to see also the available capacity and capacity load in h?

thanks in advance and have a good day!

Walter

Accepted Solutions (0)

Answers (0)