Hello Everyone,
I need help with the following scenario. I have configured the BOM setup, and when I enter the material in the sales order, the BOM explodes and the plant is automatically determined.
However, the requirement is to change the plant in the sales order after saving the document. Currently, the plant field is greyed out for the header BOM and cannot be edited.
Could you please advise how this can be handled?
Request clarification before answering.
After saving, it is not possible to change the plant. Before save, you can change the plant.