Good morning everyone,

I need some help!

I have to create subcontract orders that call the bill of materials automatically (*)

I can save the order and the bill of materials is active. The problem arises when I have to make the transfer - with reference to the subcontract order Movement 541 - to the subcontractor's supplier, I get the message M7064 > Document & & & does not contain any selectable items


Before placing the order I fulfilled all these prerequisites:

  • The material master of the assembly must have the special procurement type key assigned as 30.
  • A subcontracting BOM must exist in the system.
  • The purchasing view of the material master must be maintained.
  • A purchasing information record (info record) is needed between the material and vendor to reflect the source of supply.
  • In SAP S/4HANA, a production version must also exist ( SE38 = CS_BOM_PRODVER_MIGRATION02 + C223 to check production versions are available)

(*) By doing this manually, the system creates a requirement, which is why it then recognises the transfer posting to the supplier (541).