Hi experts,

I'm having some trouble with routing selection when using ECN in routing creation.

I tested a case where I have 3 routings without ECN, and the Order asked me which one of the 3 I want to use.

Then I created a routing with ECN. The order asked only one routing without ECN and the new routing with ECN.

Do you know if there is any relation about using the ECN in Routings and using at the same time Routings without ECN, when selecting the routing in production order?

Anybody can help?

Thank you,

Caio.

Accepted Solutions (0)

Answers (1)

Answers (1)

Ayoub_Habchi
Contributor
0 Kudos

Hello Caio,

Can you please specify the date rages for all the four routings and the date when you tried to use routing in order ?

Regards,

Ayoub.

0 Kudos

Hi Ayoub,

All the 4 routings are valid from Oct.2014 to 31.12.9999.

The Order date is from Apr.2015.

I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.

Thanks,

Caio.

Ayoub_Habchi
Contributor
0 Kudos

Hello Caio,

The system is chosing the routing based on the date from the ECN.

Please check also the production versions and dates in ECN documents.

Regards,

Ayoub.