Routing Lines only for backflush not used for Material Cost Estimation

sebastian_hock2
Discoverer
0 Kudos
234

Dear experts,

I´m searching for an option to use one line in Routing CA03 only for the backflush - which is on our site based on preliminary cost estimate MF30 but it should not be part if the Material cost estimate created with CK11N or CK40N.

The costing relevancy is not helping here as it´s changing both.

Thanks for input upfront.

Best Regards

Sebastian

View Entire Topic
former_member214736
Participant
0 Kudos

Hi,

If by line you mean sequence

Costing happens with 0 sequence, you can add your line to second sequence

if you mean routing as line

create two Production version with same validity and lot size (both should be valid at once)

to the first PV(sorted by verid) assigned to costable routing

to the secont PV assign the non costable routing

both the option, will not accect the planned cost but will affect the actual cost.