cancel
Showing results for 
Search instead for 
Did you mean: 

Route schedule not getting updated in Purchase order

Former Member
0 Kudos
772

Route schedule S72D30-4

Please can you advise why the route schedule is not populating for orders to A from B . ( ship to party ) 

A and B are customer  master

Transit time is confirmed as 30 days and the route schedule is set up correctly for the shipping conditions 8A & 8B.

The mentioned route schedule not getting  populated in the STO in the delivery schedule tab.

These notes were given for reference by Tej Yadav  but i could no find any checks from this for resolving the issue.

Check below SAP Notes for your query,

146829   -> Process flow of route schedule

1363175 -> Route Schedule determination with Itinerary fails

Need urgent help

Thanks

Sujatha Iyer

Accepted Solutions (0)

Answers (1)

Answers (1)

ajitkumar
Active Contributor
0 Kudos

pl check the route determination in config logisitc execution > transportation > routes > route determination>maintain route determination. for the combination check for the element without weight group.

pl check whether the same tptn group is maintained n the sales view of MM and the shipping condition is maintianed in the customer master

Former Member
0 Kudos

Hi Ajit,

Can  u tell me what needs to b checked  in the config mentioned above?
Also What do u meant by same tptn group??

Thanks,

Sujatha Iyer.

ajitkumar
Active Contributor
0 Kudos

if you to the config path you will find that routes are maintained for the combination of transportation group and shipping condiiton ( you need to check the data pertaining to the county of dep.. country of origin line relevant for your company )

in this transportation group is coming from the material master sales general / plant tab in shipping data sub section and the shipping conditon is coming from the customer master > sales area data > shipping tab.

since it is working for some other materials, i assume that the configuration for these elements are already in place.

for the STO where shipping is not triggered, check tptn group  for the material and the shipping conditon for the customer number of receiving plant.

Former Member
0 Kudos

Hi Ajit,

What is tptn group? Can you explain ??

ajitkumar
Active Contributor
0 Kudos

for config help data

'The system can only carry out route determination if the transportation group is included in the material master record. As the transportation group is a prerequisite for route determination, you should select the transportation group in the material master record as a required-entry field to guarantee the entry. The section "Define material types" provides information on marking fields in the material master record as required-entry fields.'

on abstraction,  it is a piece of data to give more flexibility in route determination.

you can get a better idea by reading the help data in all the items of route determination