on 2023 Jun 06 4:26 PM
Hello Everyone,
Need a quick help from you all. When i create production order the reservations for movement type 261 are created.
Now my client requirement is that, these reservations are created at RM01 sloc and they want these reservations to get transferred to Production sloc.
I have tried BAPI for goods movement create to transfer these reservations to production SLOC via 311 movement type, but it is throwing an error "Goods movement with movement type 261 not possible'
How do we transfer these reservations from one location to another. This is discrete industry.
Please suggest.
Thanks in advance.
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Hello
You can explore transaction MF60 to post the transference of those materials to the production storage location.
Regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes not possible
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes as per that SAP note, it is not possible with 311 but only possible with 301
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Standard movement type to transfer stock from one storage location to another storage location is 311. Did you try manually mb1b or MIGO with movement type 311? Did you face the same issue ? If so, what is the error message number ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can use SAP standard material staging option for this requirement.
Refer to this link Pull List
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please check this 311 Movement Production Order
Sorry Sir, but this is not the solution.
I don’t want to create 311 reservations, instead I want to transfer the 261 reservations from sloc RM01 to PD01 location which are created automatically after production order creation. So I want to do transfer posting of these 261 reservations against production order to another Sloc location which will create a movement type 311.
Thanks
| User | Count |
|---|---|
| 30 | |
| 26 | |
| 21 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 3 | |
| 3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.