Relation Between Move Time and Wait Time in Routing

ziqhaziq
Member
0 Kudos

I have a Routing with 9 operations (0010, 0020, 0030, 0037, 0038, 0039, 0040, 0050, 0060).

All the Operations have Flow Manufacturing ticked except for Operation 0020, 0030 and 0060.

All these Operations have 1 Day in their Standard Move Time. Operation 0050 also has 180 minutes Wait Time.

Please help to explain why in my Production Order which is created based on this Routing, operation 0050 has Move Time assigned 1 Day while the other Operations using Flow Manufacturing have the 0 day Move Time. Is there any relation between Wait Time and Move Time in Operation 0050?