Read master data and atp

former_member306740
Participant
0 Kudos
161

Hi All,

1.    We will be running read master data to all created process orders. When we re-read Master Data we get missing parts that are available in plant xxxx to cover the requirement, (means we are getting missing parts for the materials eventhough the stock is available for those materials in that plant).

When we save the Process Order with these missing parts and then enter again to click in the material availability check – ATP, we get: “All checked materials in order are available.

Kindly let me know is the standard bug in SAP? please guide me in this regard.

Regards,

Santosh.

Accepted Solutions (0)

Answers (2)

Answers (2)

ArturoSenosain
Advisor
Advisor
0 Kudos

Hi Santosh.

some ideas:

1: In PP Orders, there are 2 different availability check rules, one that trigers on the creation (status open) and other when Released. At save, you customize if the ATP check triger again. OPJK

2. Check the 2 availability procedures and what elements consider  OKJJ

3. Remember that Reservations and Availability Check are 2 different stufs, so the availability check is analized in CO06 / CO09, not in MM tcodes.

Arturo.

krishna_chandra5
Active Contributor
0 Kudos

Hi,

     Please check whether the quantity of the components are reserved to the same order previously. Please take a look of the reserved column in MMBE before and after the read master data.

I am not too sure about it, but may be a possible cause.

Regards,

Krishna Chandra

former_member186193
Active Contributor
0 Kudos

Hi,

Please check that if you are doing read master data after doing some goods issue.

Regards,

Alok Tiwari