on 2013 Aug 03 7:34 AM
Hi All,
This is a MTO scenario in which the Sales order Quantity is 100 and In which a BOM has been maintained with scrap of 5% with 10 different Raw Materials. After the MRP Run the Pur .req has been generated for the Raw Materials and the Production Order for the FG(Finished Goods). During the Production there was a Excess Loss/Scrap for three raw Materials and due to this a percentage of FG was unable to get produced. so we have to Procure that three materials alone. So how do we procure that three raw materials with reference to Sales Order and How will the reproduction order will be generated.
Please provide your inputs to solve this.
Regards,
Vibin
Request clarification before answering.
Hi all,
Thanks for providing your inputs , but how do i procure the extra required raw material. With reference to what will i procure and how i can track in the make to Order scenario. How can i run a MRP for that or what can be the different options.
Regards,
Vibin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vibin,
In my previous reply, I have considered it as rework but this is as usual common scenario, 3 raw materials you will received as scrap(mvt-531) in production order. You have to create manual purchase requisition and order for procuring this 3 raw materials. You can issue raw materials and received rest of FG against same production order and sales order.
Thanks,
Biplob